Thursday, September 27, 2007

The first meal !

Susan prepares her first meal in the new kitchen. She declined an appearance.

The Bathroom hall finale


This is the flooring, trim and utility cabinet for the hall. I did clip on the overhead light covers as an afterthought but it wasn't worthy of another picture. These final details are killing us ! Please click on the last pictures to admire Nick's crown molding and baseboards/shoe molding.



Thursday, September 13, 2007

The Under-counter lights

There was a special request for a look at the under-counter-lights. You have a weird perspective thing here but you get an idea of the light kit.

Saturday, September 8, 2007

Backsplash work starts

Here's the backsplash in progress. It's called "Subway tile". The green dots are spacers, the grouting will be Monday after the last cabinet comes in.

Thursday, September 6, 2007

And then there was water.....and it was good !


The microwave is up (but not wired yet)



Under the sink

Here's what the wizard has done under the sink. The only addition will be the In-Sinkerator (hot water), on the left side. Nick is waiting for an adapter for the countertop (September 14th-ish).

The plumbing through the lazy-susan cabinet



Saturday, September 1, 2007

Counter-top day.......YES !

The gadget on the left is some sort of vacuum device that squeezes the two parts of the counter together to get a seam-less seam. It's called a "Parallign Gorilla-Grip".